A flood insurance claim job which included drywalling and restoring a cedar. This was an insurance flood claim where the whole basement had the bottom 2 feet of drywall cut out and required a 4 foot cedar wall repair.

THE OBJECTIVE

This was an insurance flood claim where the whole basement had the bottom 2 feet of drywall cut out and required a 4 foot cedar wall repair.

HOW IT WAS ACHIEVED

This job actually was very difficult and was past on by a few other companies before getting to us. In restoration jobs the goal by the insurance company is to restore the home back to what it was before the claim. This cedar wall was very difficult for contractors to find the correct matching cedar panel. For one to understand, cedar comes in all different shapes, sizes and tones of color. We have a very diverse group on our team and have a product sourcing specialist who recognized the cedar paneling right away because of his extensive experience at building supplies vendors.